Yesterday, then, the long road had an end, the project finally got done. Our junior member David took up heart and down the pipes, replacing the zip-ties around the pipe with well moving (and sounding) metal rings.<figure id="attachment_673" style="width: 300px;" class="wp-caption alignright">
[<img class="size-medium wp-image-673" src="http://wp.realraum.at/wp-content/uploads/2016/06/DSC_4876-300x105.jpg" alt="no more sliding rods" width="300" height="105" />](http://wp.realraum.at/wp-content/uploads/2016/06/DSC_4876.jpg)<figcaption class="wp-caption-text">no more shifting rods</figcaption></figure>
Yesterday, then, the long road had an end, the project finally got done. Our junior member David took up heart and down the pipes, replacing the zip-ties around the pipe with well moving (and sounding) metal rings.<figure id="attachment_673" style="width: 300px;" class="wp-caption alignright">
[<img class="size-medium wp-image-673" src="http://wp.realraum.at/wp-content/uploads/2016/06/DSC_4876-300x105.jpg" alt="no more sliding rods" width="300" height="105" />](http://wp.realraum.at/wp-content/uploads/2016/06/DSC_4876.jpg)<figcaption class="wp-caption-text">no more shifting rods</figcaption></figure>